Free PDF plans for kitchen remodeling - day 11 of 17 - trim work, counter tiling preparation, cabinet construction and easy free woodworking projects. Discover thousands of images about kitchen remodeling - day 11 of 17 - trim work, counter tiling preparation, cabinet construction. The best way to begin your hobby or small business in building furniture, woodworking and kitchen remodeling - day 11 of 17 - trim work, counter tiling preparation, cabinet construction.

Woodworking Projects & Plans for "Kitchen Remodeling - Day 11 Of 17 - Trim Work, Counter Tiling Preparation, Cabinet Construction":

Kitchen Remodeling - Day 6 Of 17 - Drywall Sanding, Taping, Mudding

Kitchen Remodeling - Day 6 Of 17 - Drywall Sanding, Taping, Mudding

Day six starts with some extra demolition work. Neil removes some backsplash tile around the window sil. After returning from Lowes, I use a vacuum drywall sander to do some drywall sanding, then I move on to installing new sheetrock and insulation for the kitchen walls.Tools used: Shop-Vac Hand San...

Kitchen Remodeling - Day 7 Of 17 - More Drywall, Kitchen Cabinet Installation

Kitchen Remodeling - Day 7 Of 17 - More Drywall, Kitchen Cabinet Installation

The first priority of day seven is to finish up some more drywall sanding and mudding. The next plan is to start installing kitchen cabinets. We chose the IKEA Sektion cabinet line. First I get started with installing metal rail brackets to the wall, then we bring in and install the oven cabinet, a ...

Kitchen Remodeling - Day 11 Of 17 - Trim Work, Counter Tiling Preparation, Cabinet Construction

Kitchen Remodeling - Day 11 Of 17 - Trim Work, Counter Tiling Preparation, Cabinet Construction

Day eleven starts off with some more drywall and trim work. Next we move on to counter-top preparation - adding on sheets of 3/4 inch plywood, securing the plywood, making cutouts for the sink and stove top and getting them roughed in. Toward the end of the day I work on building out some more of th...

Kitchen Remodeling - Day 12 Of 17 - Counter Top Tile Prep, Mortaring, Drywall And Texture

Kitchen Remodeling - Day 12 Of 17 - Counter Top Tile Prep, Mortaring, Drywall And Texture

Day twelve starts out with some more drywall work on the expanded passage between the dining room and kitchen, and soffit box, followed by repainting the soffit box. Next, Neil gets started on cutting metal rails that will act as a boundary for pouring mortar for the granite counter-top tile underla...

Kitchen Remodeling - Day 8 Of 17 - Upper Cabinet Installation, Kitchen Floor Tiling

Kitchen Remodeling - Day 8 Of 17 - Upper Cabinet Installation, Kitchen Floor Tiling

Day eight of our kitchen remodel is focused on two main tasks: I work on finishing customization for some IKEA Sektion cabinets and install the five upper cabinets above the sink area. Neil works on cutting tile and laying the majority of the rest of the kitchen floor tile.Tools used: Zircon Corpora...

Kitchen Remodeling - Day 14 Of 17 - Upper Cabinets, Electric, Lighting, Granite Counter Install

Kitchen Remodeling - Day 14 Of 17 - Upper Cabinets, Electric, Lighting, Granite Counter Install

Day seventeen gets started with final installation of upper cabinets above the sink. We used IKEA Sektion cabinets that were custom altered for our needs. After getting the upper cabinets in place, I work on installing a GFCI electric box and wire up IKEA Omlopp LED lights in the cabinets. Next, Nei...

Kitchen Remodeling - Day 13 Of 17 - Trim Work, Water Line, Granite Counter Tile Layout

Kitchen Remodeling - Day 13 Of 17 - Trim Work, Water Line, Granite Counter Tile Layout

Day thirteen starts with painting and touch-up work for previous days drywall. Next, Neil starts on layout for our granite tile countertop. We used 12" granite tiles from MSI Stone, in a color called Blue Pearl. I work on trimming out the new passageway we opened up between the kitchen and dini...

Kitchen Remodeling - Day 9 Of 17 - Drywall, Painting, Cabinet Installation, Plumbing

Kitchen Remodeling - Day 9 Of 17 - Drywall, Painting, Cabinet Installation, Plumbing

Day nine starts with some drywall sanding, then we get started painting the kitchen. After early morning work is done, we progress on to installing base cabinets. We install the IKEA Sektion sink cabinet and do some plumbing work. The dishwasher is blocked in. Installation is completed on the corner...

Kitchen Remodeling - Day 10 Of 17 - Drywall Work, Tile Grouting, Base Cabinets Installation

Kitchen Remodeling - Day 10 Of 17 - Drywall Work, Tile Grouting, Base Cabinets Installation

Day ten starts with some drywall work - adding sheetrock and mudding around a new passage we opened up between the dining room and kitchen, and then moving on to mudding the new soffit box. Neil grouts the second half of the kitchen floor that was tiled the day before. Next we continue on with insta...

Kitchen Remodeling - Day 5 Of 17 - Opening Passage In Wall, Electric, Drywall,

Kitchen Remodeling - Day 5 Of 17 - Opening Passage In Wall, Electric, Drywall,

We start day five of the kitchen remodel getting some more electrical work done - running a line that will provide electric to the kitchen cabinet peninsula, powering the stove top, a new wine fridge, and a GFCI that I will install at the end of the peninsula. Our next project is further cutting ope...

Dining Room And Main Foyer Home Trim Work By Carpentry Masters

Dining Room And Main Foyer Home Trim Work By Carpentry Masters

Arched doorways, large crown moldings, octagon shaped custom dining room coffer ceiling all as one decorative trim work package.Striking main foyer decorations featuring high crown molding arched headers with recessed panels. Everything topped off with designer wall trim shapes and custom made wains...

Kitchen Remodeling - Day 15 Of 17 - Toilet Install, Trim Work, Backsplash Installation, Counter Edge

Kitchen Remodeling - Day 15 Of 17 - Toilet Install, Trim Work, Backsplash Installation, Counter Edge

Day fifteen starts out with bringing the refrigerator back in and installing the toilet back in the powder room attached to the kitchen. Next I work on trim work around the new passageway between the kitchen and dining room. Neil gets started on installing the backsplash. We used a 12 inch backsplas...

Kitchen Remodeling - Before And After Summary Of Our Diy Remodel

Kitchen Remodeling - Before And After Summary Of Our Diy Remodel

My brother Neil and I remodeled our kitchen. This video shows an overview of the DIY kitchen remodel with comparison shots of before and after, and I discuss some of the changes we made. This was a complete kitchen remodel - we demolished the existing kitchen down to the slab foundation and built up...